Low-volume, high-mix PCBA for appliance brands, hardware startups and importers launching a private-label range. Three SMT lines in Ningbo, China — boards already designed and in production, or for assembly from your own BOM. Both 110V and 220V are built in-house.
Most buyers arrive by one of two doors. Both are open.
Five control board families are designed, validated and running in production right now. You pay no development fee and no tooling charge — put your brand on the housing and we ship the board.
Smart switch (incl. single-live-wire), air fryer, panel heater, ceiling fan light, 4-in-1 bathroom heater.
View the boards →Send BOM + Gerber + quantity and you get a firm quotation within 48 hours. Turnkey with component sourcing, or consigned if you supply the parts — your choice.
Single and double-sided FR-4, 0402 and up, SMT plus wave-soldered THT, functional test on every lot. We do not accept BGA, HDI or rigid-flex — and we say so up front.
How quoting works →Designed in-house, in mass production, available with your logo. Ready for 110V or 220V.
Single live wire — works where there is no neutral. Touch panel, WiFi or Zigbee, 1/2/3 gang.
Details →Digital touch UI with NTC temperature control for 1500W–1800W elements.
Details →Thermostat, weekly timer and remote for 1500–2000W heaters. Relay or triac output.
Details →3-speed fan control plus dimmable constant-current LED driver on one board.
Details →Heat, ventilation, lighting and fan control for ceiling-mounted bathroom heaters, with over-temperature cut-off.
Details →We are not the cheapest board shop in China. We are the one that picks up the phone when the first one slips.
The design is done and in production. You skip the development fee and the 2–3 month design cycle.
500 pieces for a test build. Large EMS shops decline these outright — which is exactly when a backup matters.
Both built in the same plant, so one supplier covers your North American and EU/Middle East lines.
3 SMT lines, wave soldering, functional test. ISO 9001 and CE documentation provided with every shipment.
From first email to container, four steps.
Send BOM, Gerber and quantity. Firm quotation within 48 hours, including your choice of turnkey or consigned material.
First sample in 2–3 weeks — roughly half what a large EMS typically quotes. 7–10 days if you are against a deadline.
Standard lead time 30 days from sample approval. Functional test on every lot before packing.
FOB Ningbo, or EXW if you have your own forwarder. CE and ISO documentation included.
Tell us the board, the quantity and whether you supply the components. We answer within 24 hours.
Request a Quote